Mick, Bob and I used Saturday to begin to build our skyberm, a steep wooden berm that will sit 5 feet off the ground. We got a lot if structure built and have another days work left in the workshop before moving it to site.
Day 2:
The Chasetrails build crew used Sunday to make a huge dent in the woodwork. Martin felled a tree that had been missed last week whilst everyone else got to grips with last weeks stumps.

Once the tree was out, we got cracking in building the platform that will form the first feature on the demo trail.

All the posts in, most straight!

Crossbraces go on

Done!

For the sake of safety, this won't be decked until just before the apf show.
- Posted using BlogPress from my iPhone
No comments:
Post a Comment